Viking Construction

"ISDS, Inc. consulted and worked on the marine section of this project, which consisted of dredging a 6 foot deep trench below the river bed to accommodate a 12" cast iron pipe, laying the pipe, and backfilling the trench, all in approximately 12 to 15 feet of water.

The dredge materials and river conditions encountered were very challenging but with Inner Space Dredging Services' experience and "trouble shooting" expertise the dredging field, the time and costs spent on the dredging and installation of the pipeline were greatly reduced."